TWO PART EPOXY BINDER FOR QUARTZ/RESIN MORTARS

MALTA BASE

COD: MALTA BASE

Two part solvent-free epoxy binder for quartz/resin mortars.

description

is a solvent-free liquid two-part epoxy resin consisting of: • component A: liquid epoxy prepolymers and special additives; • component B: copolymerization amine. has been specifically designed to be added in variable quantities to quartz sands (of various grain sizes) to obtain quartz-resin mortars with physical-mechanical performances superior to normal cement mortars.

use case

  • MALTA BASE is used as a base binder to formulate epoxy mortars for the following applications:
  • • creation of slope-forming fills with thicknesses from 1 mm to any thickness before applying resin coatings, particularly in the food industry;;
  • • repair of holes and depressions in industrial quartz floors, in all industrial sectors;
  • • construction of coves and bearings (bridges and viaducts);
  • • creation of base coves between floor and wall before appliyng a resin floor;
  • • realization of coatings and hardening finishes on industrial floors (screed coverings) in the renovation of old quartz concrete floors;
  • • creation of waterproof resin fills with mechanical resistance much higher than industrial concrete (intended for heavy mechanical engineering).

technical features

  • Impermeabilizzante

field of use

applications

  • Bicomponente

certifications

Application type Minimum consumption Maximum consumption U.M. Notes
Consolidating and wetting primer for concrete surfaces and screeds before the application of resin coatings 0,15 0,20 kg/m² + 2.2 kg of QUARZO MIX sand.
For 1 mm thick mortars with “damp earth” consistency 0,125 0,125 kg/m² + 2 kg QUARZO MIX sand.
For 1 mm thick closed-pore mortars 0,3 0,3 kg/m²
Variant Packaging ADR Pallet packaging Components
EST (for summer) kit (A+B) - 3 kg P* - A = 2 kg (steel bucket)
EST (for summer) (A+B) - 30 kg - A = 20 kg (steel bucket)
EST (for summer) (A+B) - 1500 kg - A = 1000 kg (tank)
INV (for winter) kit (A+B) - 3 kg P* - A = 2 kg (steel bucket)
INV (for winter) (A+B) - 30 kg - A = 20 kg (steel bucket)
INV (for winter) (A+B) - 1500 kg - A = 1000 kg (tank)

Looking for more information?