TWO PART EPOXY BINDER FOR QUARTZ/RESIN MORTARS
MALTA BASE
COD: MALTA BASE
Two part solvent-free epoxy binder for quartz/resin mortars.
categories:
Description
MALTA BASE is a solvent-free liquid two-part epoxy resin consisting of: • component A: liquid epoxy prepolymers and special additives; • component B: copolymerization amine. MALTA BASE has been specifically designed to be added in variable quantities to quartz sands (of various grain sizes) to obtain quartz-resin mortars with physical-mechanical performances superior to normal cement mortars.
Field of application
- MALTA BASE is used as a base binder to formulate epoxy mortars for the following applications:
- • creation of slope-forming fills with thicknesses from 1 mm to any thickness before applying resin coatings, particularly in the food industry;;
- • repair of holes and depressions in industrial quartz floors, in all industrial sectors;
- • construction of coves and bearings (bridges and viaducts);
- • creation of base coves between floor and wall before appliyng a resin floor;
- • realization of coatings and hardening finishes on industrial floors (screed coverings) in the renovation of old quartz concrete floors;
- • creation of waterproof resin fills with mechanical resistance much higher than industrial concrete (intended for heavy mechanical engineering).
TECHNICAL FEATURES
-
Impermeabilizzante
field of use
applications
-
Bicomponente
CE Marking
| Application type | Minimum consumption | Maximum consumption | U.M. | Notes |
| Consolidating and wetting primer for concrete surfaces and screeds before the application of resin coatings | 0,15 | 0,20 | kg/m² | + 2.2 kg of QUARZO MIX sand. |
| For 1 mm thick mortars with “damp earth” consistency | 0,125 | 0,125 | kg/m² | + 2 kg QUARZO MIX sand. |
| For 1 mm thick closed-pore mortars | 0,3 | 0,3 | kg/m² |
| Variant | Packaging | ADR | Pallet packaging | Components |
| EST (for summer) | kit (A+B) - 3 kg | P* | - | A = 2 kg (steel bucket) |
| EST (for summer) | (A+B) - 30 kg | Sì | - | A = 20 kg (steel bucket) |
| EST (for summer) | (A+B) - 1500 kg | Sì | - | A = 1000 kg (tank) |
| INV (for winter) | kit (A+B) - 3 kg | P* | - | A = 2 kg (steel bucket) |
| INV (for winter) | (A+B) - 30 kg | Sì | - | A = 20 kg (steel bucket) |
| INV (for winter) | (A+B) - 1500 kg | Sì | - | A = 1000 kg (tank) |